Please fill out the form below to download the case study.

 

 

 

Case study highlights:

  • This site is located in a prime area for businesses in need of office and warehouse space.

  • Redevelopment required a vapor barrier system to address VOC vapor intrusion found from historic manufacturing operations.

  • The vapor barrier was applied in three existing buildings on this site, totaling 9,658 square feet.

A former industrial manufacturing site with three existing structures required a vapor barrier system to address VOC vapor intrusion found from historic manufacturing operations. Considering vapor mitigation options for existing structures, the consultant and owner determined that Retro-Coat was an effective vapor barrier system to address vapor intrusion concerns.

Complete the form on this page to download the case study.