This case study reviews an active industrial facility in Southern California where PlumeStop and S-MicroZVI successfully treated CVOC contamination. The combined remedy quickly reduced CVOC concentrations below targets, priming the site for future regulatory closure.
Case study highlights:
- A multi‑faceted remedial solution mitigates CVOC contamination beneath an active business
- Successful application overcomes challenging site conditions
- Use of advanced colloidal remediation technologies from REGENESIS accelerates site toward closure with Regional Water Quality Control Board (RWQCB)
The responsible party retained Roux, a leading environmental remediation consultant, to complete the remediation project. Specifically, the remedy needed to (1) reduce CVOCs in soil, soil vapor, and groundwater to background contamination levels; (2) minimize disruption to the site tenant occupying the building; (3) coordinate with offsite property owners to complete the work; and (4) complete all work within established budgets and timeframes.